New Horizons Rehabilitation Centre Renovation Progressing Smoothly

New Horizons Rehabilitation Centre Renovation Progressing Smoothly

The New Horizon Rehabilitation Centre in Harris’ Village, Saint Kitts, is undergoing a significant renovation spearheaded by the government to enhance the safety, security, and overall environment for both residents and staff. This comprehensive project aims to modernize and improve the facility’s infrastructure, creating a more conducive setting for rehabilitation and support. The initiative underscores the government’s commitment to providing a positive and effective environment for young people within the juvenile justice system. Deputy Prime Minister and Minister of Social Development, the Honourable Dr. Geoffrey Hanley, and Minister of State for Social Development and Youth Empowerment, the Honourable Isalean Phillip, recently toured the facility to assess the progress, accompanied by Public Works Department Director, George Gilbert.

The renovation project has been strategically divided into phases to ensure efficient execution and optimal resource allocation. The first phase encompasses crucial upgrades to the facility’s core infrastructure. This includes a complete overhaul of the electrical system, replacement of damaged ceiling tiles, essential roof repairs to address leaks and structural integrity, relocation of water storage tanks for improved functionality and aesthetics, and the construction of new driveways and walkways to enhance accessibility and safety within the facility grounds. By addressing these foundational elements, the project aims to establish a safe and functional environment for the residents and staff.

The scope of the project extends beyond basic repairs and maintenance to include substantial improvements to the building’s structure and security. A second phase of the project is planned, encompassing the renovation of the Assessment Centre, a crucial area for evaluating and supporting the needs of the residents. Furthermore, this phase will address the replacement of steel railings, staircases, and window grills, along with the installation of new windows throughout the two-story building. These upgrades will not only enhance the physical appearance of the facility but also contribute to the overall security and safety of the premises.

The project’s implementation has been carefully managed through a competitive bidding process, ensuring transparency and value for money. Multiple contractors were invited to submit bids for various segments of the work, promoting fair competition and allowing for specialized expertise in different areas of the renovation. This approach has not only fostered efficiency but also provided economic opportunities for local contractors, contributing to the local economy. Director Gilbert expressed satisfaction with the smooth progress of the project and highlighted the positive impact on the local contracting community. The project’s timeline indicates that a significant portion of the work will be completed before June 2025.

Minister Phillip echoed the positive assessment of the project’s progress and expressed anticipation for the facility’s reopening later in the year. She emphasized the ongoing evaluation of bids for subsequent phases of the renovation, indicating the government’s continued commitment to completing the project comprehensively. Minister Phillip commended the diligent work of the contractors involved, as well as the staff of the Ministry of Social Development and the Department of Public Works for their dedication and collaboration in driving the project forward. This collective effort demonstrates the importance placed on providing a renewed and improved environment for the rehabilitation centre’s residents.

The renovation project at the New Horizon Rehabilitation Centre signifies a substantial investment in the well-being of the young people residing within the facility. By prioritizing a safe, secure, and supportive environment, the government aims to foster an atmosphere conducive to rehabilitation and positive development. The phased approach to the project, coupled with the involvement of multiple contractors, ensures efficient execution and community engagement. The comprehensive upgrades to the facility’s infrastructure, including electrical systems, roofing, and security features, demonstrate a commitment to long-term sustainability and the creation of a space that supports the successful reintegration of residents back into society.

Share this content:

Post Comment

You May Have Missed